Jump to content
  • Welcome to Recreational Flying!
    A compelling community experience for all aviators
    Intuitive, Social, Engaging...Registration is FREE.
    Register Log in
Marty_d

Marty d's CH-701 build log

Recommended Posts

The Sav cabin frame ends are open to the air. Dannys cabin frame is bent because his aircraft was picked up by a willy willy and dumped upside down..mine sat outside for a while after it had been crashed. It also had a life up in Blackwater for 160 hrs when it was built then down in Tottenham for another 180 hrs then it was crashed and sat outside for about 8 months. I noticed the rust inside when I pulled the cabin frame off to rebuild the centre section. When I pulled out the alu top tubes there was lots of rust on them and they were a bit corroded together. On my cabin frame when I built the girlfriend I put rustlac inside the tubes to stop it as I new it was a issue from others I had spoken to. So we are both going to make new cabin frames using my good one as a jig. This is how Danny found that the U tags are stainless steel on the Savs...I checked mine in the girlfriend and it is the same as both frames from the broken ones we have here.

 

 

Share this post


Link to post
Share on other sites
How do you get a lot of rust internally in your frame?

Have a look at photo #3 in the set above. That is the end of the main cross tube with the tabs on the ends holding the mainspar of the wings. Although the tab will be welded in, the end of the tube remains open.

I'm going to tip some etch primer in and slosh it around until the inside is coated - anyone got any other advice to stop internal rusting?

 

 

Share this post


Link to post
Share on other sites

Marty, you may or may not know how to truncate the tube ends where they meet another tube in SU?

 

It's also the same way the you bore a hole through any shape.

 

Draw your tube up to or through the other tube or shape otherwise

 

714599240_t1.jpg.70741ac88865094a4ee6014db8688525.jpg

 

Highlight all interconnecting parts.

 

The 'Edit' dropdown - select 'Intersect faces' - 'With selection'

 

Note if your parts are already grouped this will take a while to complete.

 

1112978902_t2.jpg.349f653ceb3a82dc1a38d83a9edcbfb8.jpg

 

Select parts individually and group the part before it can be removed from the other part.

 

1506403743_t3.jpg.1082bb71112ec8726d43045bbd16467e.jpg

 

Remove part. Notice fishmouth. The hole can be made in the other tube by highlighting it and delete, or delete the black intersection lines. Sometimes can right sweep and select the lot, sometimes I have to delete the segments one at a time (PIA).

 

892616417_t4.jpg.f0bf62e69dca1a6688251841ecb73742.jpg

 

 

Share this post


Link to post
Share on other sites

Marty - We've got a local rust-preventative paint product called Metalfix (and MetalFix1000) which is not only safe, because it's water based - but you can paint over rust with it, and it converts the rust to a metal phosphate, and it will never lift.

 

It is expensive, though, something like $70-80 a litre from memory. I got lucky and picked up about 30 x 1 litre containers of MetalFix at an auction a few years ago, for $30 for the lot!

 

The iron tannate rust-prevention solutions such as Fertan and Exit-Rust are good stuff if you have some rusty areas that need treatment and protection. These are based on the non-toxic tannins from poplar bark, and other tree barks.

 

 

Share this post


Link to post
Share on other sites

And here's a hole. Draw a circle on a part, extrude through, highlight as required, Intersect faces and delete what you don't want.

 

1108945911_t5.jpg.57ffb3a451862d532e1341e3b0c9621b.jpg

 

You can also extrude a tube isolated from the other parts, 'Group' it, then position it where ever you want that hole, then 'Explode' it (Edit - Face - Explode), Intersect faces etc...

 

 

Share this post


Link to post
Share on other sites

I don't really have a problem intersecting pipes on SketchUp - but printing the actual pattern to wrap around the pipe was a bit beyond it, as far as I could tell. Anyway, found another solution here - Tube Joint Pattern Generator - does the lot. I printed their solutions for each joint, taped it around the pipe and cut with a Dremel, and they fitted like a dream.

 

 

Share this post


Link to post
Share on other sites

Firewall fabricated!

 

2033178868_Firewall1.jpg.37cca9ca27767c3f207641a34952b42d.jpg

 

1153786522_Firewall2.jpg.5c479963c3969f34b861c667e5a257a2.jpg

 

559225659_Firewall3.jpg.9148fcef2e99b3abfddf7522135f382e.jpg

 

And next job... more pipe prep and welding (though not by me!)

 

1000131973_Noselegnotstarted.jpg.16c88e43752ae4ad46b0eb8c2e5ea57d.jpg

 

 

Share this post


Link to post
Share on other sites

A lot more to it than a Keil-Kraft kit eh!

 

Well done mate, you are an inspiration to others for sure.

 

Rgds. Planey

 

 

Share this post


Link to post
Share on other sites
Your doing a beautiful job marty...I gather you have a good folder and guillo at home

Not at all Mark. I have a cheap little 750mm bending brake but for all the longer stuff I visit a sheetmetal worker about 10 minutes away. He's also doing my welding - or will, as soon as I can source some ER70S-2 rods for him to use.

For the thicker parts (0.063" and over) I've learned that woodworking tools do equally well on aluminium. The old drop saw has proved very handy!

 

 

Share this post


Link to post
Share on other sites

I sourced some nylon today (HDPE actually) for use as fairleads, bearings on the nose leg and the little thingy that holds the two rudder pedal assemblies together. Cost me the grand total of $22 for enough to have plenty of stuff-ups!

 

 

Share this post


Link to post
Share on other sites

Fuselage is together! (clecoed).

 

My local metalworker came through with the welded cabin frame and noseleg. Due to a lot of renovations, then school holidays, today was the first time I got down to the shed for a decent session.

 

It all seems to fit together pretty well so I'm chuffed!

 

730618719_Fuselagetogether.jpg.49fa130967e9eea9f0fc4d4900b59733.jpg

 

 

  • Like 5
  • Winner 1

Share this post


Link to post
Share on other sites
Fuselage is together! (clecoed).

My local metalworker came through with the welded cabin frame and noseleg. Due to a lot of renovations, then school holidays, today was the first time I got down to the shed for a decent session.

 

It all seems to fit together pretty well so I'm chuffed!

 

[ATTACH=full]61253[/ATTACH]

Go! Marty. 003_cheezy_grin.gif.c5a94fc2937f61b556d8146a1bc97ef8.gif

 

 

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later for your post to be seen If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


×
×
  • Create New...