I can confirm the longer delivery times. Mine looks like closer to 9 months until it arrives here in April. Was a bit disappointed with this as I got quoted 6 months at the outside when I ordered as well. That said, it'll be worth the wait for a factory built, very tidy and flexible STOL aircraft. I have flown in Sav's and they are good, but I think the edge is in the factory finish, a little nicer in the detail and amazing space and visibility. As an aside, I'm optioning my 22-LS with the side door and aluminium luggage compartment - 30kg with easy access vs. trying to stuff a bag behind the seats in the Sav, without much success is also a big plus in my view.